Beechville Lime Plant
Design/build installation of seven lime collection systems ranging in capacity from 7,000 cfm to 60,000 cfm and one 60,000 cfm cement plant collection system complete with 10ga. welded steel material transport duct systems. (These replacement systems were installed while plant areas were in full operation.)

Brantford General Hospital
Brantford, Ontario
Design, supply and installation of a complete HVAC system (including electrical, plumbing and controls) for the new Ophthalmology Operating room and prep room. Sheet metal/HVAC alterations to the 8 storey renovation of the Stratford Pavilion/Forbes Tower project. Day to day sheet metal/HVAC maintenance and repairs of various systems. HVAC system alterations Stainless steel dishwasher exhaust system. welded kitchen exhaust system.

Xerox
Oakville, Ontario
(Toner Plant) Supply and fabrication of welded construction capture hood, complete with support frame. Supply and fabrication of stainless steel welded reducing ducts associated with the bagging units.
(Research Centre) Fabrication and installation of welded ductwork for the modification of various dust collection and make-up-air systems at the research facility. Fabrication and installation of 8-10ga stainless steel square to 1/3 round transitioning chutes, ranging from 5” wide x 8” long to 3” wide x 103” long. All interior welds were polished to a maximum 20RA finish.

Toronto Energy Project
Supply and installation of HVAC system and silencers for a Co-Generation facility.

Waterloo Landfill Power Project
Supply and installation of HVAC systems and silencer for an eight generator CO-Generation facility.

Westcast Industries
Removal of existing process equipment and make up air ductwork. Supply and installation of a new 12ga welded, galvanized steel make up air duct system.

Kellogg's
Supply and installation of a 10ga stainless steel dust collection system, complete with a 10,000 cfm dust collector.

Armco Steel
Mansfield, Ontario
Supply and installation of a 10ga stainless steel dust collection system, complete with a 10,000 cfm to module baghouse.

Dofasco
Approved maintenance contractor for sheet metal siding/cladding and HVAC services. (Refrigeration) Approved capital project contractor. Completed various sheet metal, cladding and HVAC projects

Nelson steel
Lake Erie Plant
Removal of roof exhaust fans, curbs and flashing. Supply and installation of a new exhaust fans, roof curbs and roof reinforcing steel.

 

Meritor
Milton, Ontario Plant
Supply and installation of welded dust collection system.

Riverside Brass
Cladding and insulation of two baghouses.

Penman
10" diameter 304-2B stainless steel drain lines for washer system.

Canamera Foods
Stainless steel hoods and covers. Stainless steel bypass drain pipe.

Kester Solder
Melting pot stack removal and replacement of existing with new stacks including schedule
“10” stainless steel jacketing.

Aimco Dana BPI
Modifications to an existing dust collection system including fabrication, painting and installation of a 78î dia. 10ga mild steel down comer duct, complete with a flex connection.

PPG
Mississauga, Ontario
Supply and installation of steel valve covers and trays. Dofasco Supply and installation of a new HVAC system for the Ambulance garage.

LaFarge
Supply and installation of compressor room dust collection system, complete with 40,000 cfm baghouse.

Pure Metal Galvanizing
Supply and installation of 10ga welded dust collection system, complete with a 16,000 cfm baghouse. Relocation of an existing 60,000 cfm dust collection system, including the supply and installation of 10ga welded ducts as required to complete the system.

Stelco Steel
Hamilton, Ontario
Modification of the ductwork associated with the coke oven. Modification of dust collection systems. Design build HVAC systems for data control centres for Hot Strip Mill.

Maidstone Bakeries
Brantford, Ontario
Supply and installation of HVAC system for 270,000 square foot facility, including dust collection and numerous stainless steel projects.

London Sports Arena Labatt Centre
London, Ontario
Supply and installation of a complete HVAC System for an 11,000 seat arena and confection areas.

University Hospital
London, Ontario
Supply and installation of a sheet metal duct work and accessories for a four storey facility renovation/upgrade.

Westrock Industries
Supply and installation of welded construction duct work for duct collection system upgrade.